Finished bar with seating

Bar and restaurant tenant improvement · San Carlos, San Mateo County

San Carlos bar remodel

A San Carlos restaurant bar rebuilt around its mural wall: new L-shaped bar, back-bar shelving and refrigeration, tile floor prep and finished seating.

  • 50jobsite photos
Type
Bar and restaurant tenant improvement
Location
San Carlos, San Mateo County
Status
Complete

Project spotlight

Finished bar from the dining side

San Carlos bar remodel

  • Bar and restaurant TI
  • San Carlos
  • Complete
  • Bar
  • Peninsula
  • New L-shaped bar counter and bar top
  • New back-bar shelving and refrigeration
  • The existing mural wall was protected and kept
  • Tile floor prep and dust containment at the entry during work

Construction timeline · 38 photos · Jan 2025 to Apr 2025

Month by month: January to April 2025

Every stage of the bar remodel from our own jobsite camera: floor demolition and new plumbing in January, quarry tile, bar framing and patterned bar-front tile in February, and the finished restroom, back bar and seating in March and April. Select any photo to view it full size; use the arrow keys or swipe to move through the timeline.

January 2025 · 16 photos

Old floor tile removed
Jan 7, 2025 · Old floor tile removed
Floor demolition and debris removal
Jan 7, 2025 · Floor demolition and debris removal
Floor demolition behind dust protection
Jan 7, 2025 · Floor demolition behind dust protection
Old bar framing exposed
Jan 9, 2025 · Old bar framing exposed
New bar framing
Jan 10, 2025 · New bar framing
New bar framing in progress
Jan 10, 2025 · New bar framing in progress
New bar framing with plywood
Jan 10, 2025 · New bar framing with plywood
Floor broken out for new plumbing
Jan 25, 2025 · Floor broken out for new plumbing
Trench for new plumbing at the wall
Jan 25, 2025 · Trench for new plumbing at the wall
New concrete patched over the plumbing
Jan 25, 2025 · New concrete patched over the plumbing
Floor prep with tile staged
Jan 25, 2025 · Floor prep with tile staged
Floor prep along the walls
Jan 25, 2025 · Floor prep along the walls
New quarry tile laid out
Jan 25, 2025 · New quarry tile laid out
New quarry tile going in
Jan 29, 2025 · New quarry tile going in
New quarry tile, tools still out
Jan 29, 2025 · New quarry tile, tools still out
New bar cabinet framing
Jan 29, 2025 · New bar cabinet framing

February 2025 · 18 photos

Back-bar shelf brackets installed
Feb 1, 2025 · Back-bar shelf brackets installed
New bar cabinetry boxed in
Feb 1, 2025 · New bar cabinetry boxed in
New bar cabinet faces
Feb 1, 2025 · New bar cabinet faces
Back-bar wall with shelf brackets
Feb 1, 2025 · Back-bar wall with shelf brackets
New tile base along the back-bar wall
Feb 1, 2025 · New tile base along the back-bar wall
Tile and grout work along the back bar
Feb 1, 2025 · Tile and grout work along the back bar
Wall protected below the mural
Feb 2, 2025 · Wall protected below the mural
Gravel bed for a new floor drain trough
Feb 4, 2025 · Gravel bed for a new floor drain trough
Floor drain trough before tile
Feb 4, 2025 · Floor drain trough before tile
Tile set around the drain trough
Feb 4, 2025 · Tile set around the drain trough
Finished quarry tile behind the bar
Feb 4, 2025 · Finished quarry tile behind the bar
Patterned tile on the bar front
Feb 4, 2025 · Patterned tile on the bar front
Patterned tile bar front
Feb 6, 2025 · Patterned tile bar front
Bar-front tile along its full length
Feb 6, 2025 · Bar-front tile along its full length
Bar-front tile being set
Feb 6, 2025 · Bar-front tile being set
Patterned tile at the end of the bar
Feb 8, 2025 · Patterned tile at the end of the bar
Bar-front tile at the corner
Feb 8, 2025 · Bar-front tile at the corner
Back-bar counter and the mural wall
Feb 20, 2025 · Back-bar counter and the mural wall

March 2025 · 3 photos

Restroom finished with a new sink and tile
Mar 13, 2025 · Restroom finished with a new sink and tile
New wall tile with a decorative band
Mar 13, 2025 · New wall tile with a decorative band
Back bar with the mural and shelving
Mar 27, 2025 · Back bar with the mural and shelving

April 2025 · 1 photos

Finished bar seating
Apr 9, 2025 · Finished bar seating

Have a building like this? Let’s walk it.

We’re busy but we always have time to walk. You get a written, line-by-line price after the walk.

[email protected] · (415) 299-5369

We’re growing like crazy and hiring if you know anybody that recently got laid off? See open roles

Book a Site Walk

Three quick fields. We reply within one business day. Or call or text (415) 299-5369.

Site walk, no obligation. Price terms are in the footer. See our Privacy Policy.

  1. Walk.We walk the building with you.
  2. Line-by-line price.A written price, every trade itemized, after the walk and the information we need.
  3. You decide.No obligation. Nothing proceeds until you sign.

Larger or complex projects may take longer. Pricing is an estimate, not a bid or contract, and becomes binding only in a signed agreement.